Details: earth work -cutting-filling-embankment 3.3:excavation for road way in soil with dozer including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead 50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. 3.17:construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. 3.16:construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2. box culvert and embankment protection works 2.3.1.a:clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materia