Details: road od519408/2024-2025:main item 60.7.6. - supplying and stacking granite stone 20 to 45 dm3 for dumping works- supplying at site of work granitestone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement (deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance,loading and unloading charges all other incidental charges all leads and lifts etc. complete as per the direction ofthe departmental officers at site. od519407/2024-2025:main item 60.7.7.- conveyance and dumping of departmental granite stones-conveyance of departmental granite stone 20 to45 dm3 in size from stack at site and dumping in position (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3stones) to lines and levels to from the core of the sea wall as per approved design including all leads and lifts etc.complete as per the direction of the departmental officers at site. 3.5.2:excavation in soil with dozer with lead upto 100 m <br
Sector: RDPR