Details: detailed estimate 3.15.2:compacting original ground (ii) compacting original ground supporting subgrade loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of tables 300.1 and 300.2 for subgrade construction as per technical specification clause 303.5.2. 3.5.3:excavation in soil using hydraulic excavator and tippers with disposal upto 1000 m excavation for roadwork in soil with hydraulic excavator of 0.9 bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per technical specification clause 302.3 4.9:wet mix macadam providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of
Sector: RDPR