Details: tarring 2.14.2.a:dismantling of flexible pavements<br> dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per technical specification clause 202 <br> (ii) by mechanical means<br> (a) bituminous courses 3.14:construction of subgrade and earthen shoulders<br> construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1. od18544/2025-2026:granular sub-base/base/surface course with local materials (table 400.13) by mix in place method normal. construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting
Sector: RDPR