Details: drain 2.5.1.a:dismantling of structures <br> dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including t&p and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per technical specification clause 202. <br> (i) by manual means <br> (a) lime concrete od409434/2024-2025:ring bund type ii putting up ring bund with earth fille gunny bags of top width 1.0mbottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining thesame leak proof till the completion of the work and clearing the site by dismantling the bund aftercompletion of thework.etc.complete ( as per modified data 60.1.2) od492624/2024-2025:bailing out water using 5hp pump- bailing out water with 5hp engine and pump setincluding conveyance
Sector: RDPR