Details: road concrete od532455/2024-2025:construction of sub grade and earthen shoulders construction of sub grade andearthen shoulders with approved material obtained from borrow pits with all lifts and leads,transporting tosite, spreading, grading to required and compacted to meet requirement of table 300.2with lead upto1000 m as per technical specification clause 303.1. (3.14 modified with increasedcompensation andadditional conveyance (kuttanad thaluk) od423451/2024-2025:granular sub base /base /surface course with local materials by mix in place method normal .construction of granular sub base by providing local materials spreading in uniform layers with morter grade on prepared surface ,mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desire dencity complete as per clause technical specification clause 408 75.8.1:providing plain cement concrete for road work cc 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to requ
Sector: RDPR