Details: building maintenance 15.28.2:dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :asbestos sheet 15.44.1:dismantling g.i. pipes ( external work) including excavation and refilling trenches after taking out the pipes, manually / by mechanical means including stacking of pipes within 50 metres lead as per direction of engineer- in- charges:15 mm to 40 mm nominal bore 12.48:providing & fixing on roof pressed clay tile (mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately) 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) 13.60.1:wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:two or more coats on new work 14.46:removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth in
Sector: RDPR