Details: appendix -a -road surfacing work. 2.2:clearing grass and removal of up to a distance of 50 metres outside the periphery of the area 2.4.4.e:dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including t&p and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres dismantling stone masonry - dismantling stone pitching/ dry stone spalls. 2.4.4.d:dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including t&p and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres dismantling stone masonry - dry rubble masonry 3.6:excavation for ro
Sector: PWD