Details: side protection 11.1.1.1:excavation for structures <br> earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> i. ordinary soil <br> (i) upto 3 m depth 12.7:supplying, fitting and placing tmt bar reinforcement (fe 415) in substructure complete as per drawings and technical specification clauses 1002, 1005, 1010 & 1202 11.4.1.1:providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 <br> i. p.c.c grade m 10 <br> (i) nominal mix 1:3:6 dry rubble masonry 10.26.1:providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railin
Sector: RDPR