Details: construction of side wall 2.8.1:earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kinds of soil od233959/2024-2025:dry rubble masonry with departmental stone - dry rubble without concrete levelling course masonry with good quality departmental rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc.complete as per direction of departmental officers at site od233960/2024-2025:dry rubble masonry with hard stone, in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. 5.9.1:c
Sector: RDPR