Details: road resurfacing od150737/2024-2025::filling up holes (cut and formed to regular shapes and all loose and defectivematerials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone andcompacting with power roller to get a compact surface. 3.2:preparation of foundation for embankment <br> scarifying existing bituminous surface to a depth of 150 mm by mechanical means <br> scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4. 4.9:wet mix macadam <br> providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 1
Sector: RDPR