Details: de silting od241933/2024_2025 : excavation for pond work in soil with hydraulic excavator of 0.9 bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m od241934/2024_2025 : earth work in excavation of existing pond dressing of sides and bottom, and removing the excavated earth up to 500m away from the site.<br>marshy soil - mechanical means bailing out water 60.2.3 : bailing out water using pump above 5 hp and up to 10 hp-bailing out water with engine and pump set above 5hp and up to 10hp, including conveyance to site and ,cost of fuel, lubrication oil and other stores, pay of staff etc complete
Sector: Forest and Environment