Details: reconstruction of dr drain 2.5.1.b:dismantling of structures dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including t&p and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per technical specification clause 202. (i) by manual means (b) cement concrete 2.7.d:dismantling stone masonry as per technical specification clause 202. dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per technical specification clause 202. (d) dry rubble masonry od492033/2024-2025:dr with departmental. stone - dry rubble masonry _ dry rubble without concrete levelling course using depar
Sector: RDPR