Description: MAKKARAPARAMBA GP UNNAMETTAN ROAD RENOVATION 50 25 General Civil Work WARD 3 Work Name Annual Plan MAKKARAPARAMBA GP UNNAMETTAN ROAD RENOVATION 50 25 General Civil Work WARD 3
Details: ROAD 3.2:Preparation of Foundation for Embankment <br> Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means <br> Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. 5.5.A.1a:Modified Macadam 50 mm thick using Bitumen S-65 <br> Construction of macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. 5.2.1a:Tack Coat<br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Cl
Sector: RDPR