Details: construction of comfort station 15.2.2:demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in-charge.nominal concrete 1:4:8 leaner mix ( including equivalent design mix) 15.3:demolishing r.c.c. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of engineer -in-charge. 15.7.1:demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge.in mud mortar od482188/2024-2025:engaging labour 2.8.1:earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and dispo
Sector: RDPR