Details: concreting od349915/2024-2025:surface dressing of the ground including removing vegetation and in-equalities not exceeding 15cm deep and disposal of , lead upto 50m and lift up to 1.5m. all kinds of soil od349917/2024-2025:filling with contractors own earth (excluding rock ) in open areas in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering , lead up to 50m and lift upto 1.5m as per direction of site eic od349916/2024-2025:filling with quarry muck filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, levelling the top at site and consolidation by ramming etc complete for improving the cbr value of subgrade od463698/2024-2025:patchwork for reconcrete .providing concrete for plain /reinforced concrete in open foundations complete as per drawings and technical specifications 75.8.1.1.a:providing plain cement concrete for wearing coat cc 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to
Sector: RDPR