Details: road concreting od547298/2024-2025:supplying and fixing information board 75x60cm using gi pipes as post and ms sheet surrounded by ms angles including painting , lettering and fixing in position as per direction of engineer in charge (mord) 3.4:construction of embankment with material obtained from borrow pits <br> construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m as per technical specification clause 301.5 od547300/2024-2025:filling with quarry muckfilling up low lying and water logged areas with local material/ quarry muck, spreading inlayers, leveling thetop at site and consolidation by ramming, etc complete for improving the cbr value ofsubgrade 75.8.1:providing plain cement concrete for road work cc 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required and camber in p
Sector: RDPR