Details: foot path interlock od349717/2024-2025:filling with contractors own earth (excluding rock ) in open areas in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering , lead up to 50m and lift upto 1.5m as per direction of site eic od349718/2024-2025:filling with quarry muck filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, levelling the top at site and consolidation by ramming etc complete for improving the cbr value of subgrade od349710/2024-2025:interlocking concrete block pavement, providing and laying of interlocking concrete block pavements having thickness 80mm as per drawings and technical specification clause 1504. 75.8.1.1.a:providing plain cement concrete for wearing coat cc 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required as required including compaction, finishingand tamping etc .complete. max. size of course aggregate not exceeding 25mm , mixedin concrete mixer et