Description: 41039 Annual Plan DPT 2024 25 PARAPPOOKKARA GP IRINJALAKUDA BP COMPLETION OF NANTHIKKARA V H S S BUILDING PARAPPU NEW Pro 1413 24 25 In IRINJALAKUDA BP General Civil Work Work Name Annual Plan DPT 2024 25 PARAPPOOKKARA GP IRINJALAKUDA BP COMPLETION OF NANTHIKKARA V H S S BUILDING PARAPPU NEW Pro 1413 24 25 In IRINJALAKUDA BP General Civil Work
Details: BALANCE WORK 11.41.2:Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and shades, laid on 20 mm thick cement mortar 1:4(1 cement : 4 coarse sand), including grouting the joints with white cement and matching pigments etc., complete.Size of Tile 600 x 600 mm. 11.46.2:Providing and laying Vitrified tiles indifferent sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, in skirting, riser of steps, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand), including grouting the joint with white cement & matching pigments etc. complete.Size of Tile 600x600 mm OD5107/2025-2026:Providing and fixing factory made panel PVC door shutter consisting of frame made out ofM.S. tubes of 19 gauge thickness and sized
Sector: RDPR