Details: anganwadi building 2.31:clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared 2.8.1:earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kinds of soil od310717/2024-2025:dry rubble masonry with hard stone,in foundation and superstructure including packing to compactness to lines and levels,cost and conveyance of all materials labour charges etc.complete as per approved drawing and relevant technical specification(modified 75.7.1) 7.1.1:random rubble masonry with hard stone in foundation and plinth inclu
Sector: RDPR