Details: road 3.5.2:excavation in soil with dozer with lead upto 100 m excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. od321488/2024-2025: dry rubble masonry _ dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of departmental officers at site od206278/2024-2025:filling with contractors own earth ( excluding rock) in open areas in layers notexceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50m andlift upto 1.50m as per direction of site engineer-in-charge. (od from mord 3.3 & 3.4) od206279/2024-2025: filling up low lying and water logged areas with local material/ quarrymuck, spr
Sector: RDPR