Details: building construction 2.32:clearing grass and removal of the up to a distance of 50 m outside the periphery of the area cleared. 2.6.1:earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.all kinds of soil od403984/2024-2025:sand piling using good quality 6 mm metal chips 10 cm dia bore holes including all cost of material labour and machinery charges od343309/2024-2025:filling with quarry muck <br> filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the cbr value of subgrade 2.8.1:earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width
Sector: RDPR