Details: protection work 50.2.3.1:pumping or bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete od490349/2024-2025:dr with departmental stone - dry rubble masonry-dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc.complete as per direction of departmental officers at site od490350/2024-2025:dismantling dr-dismantling ,clearing away and carefully stacking materials useful for reuse for any thickness of walls in dr masonry including disposal of debris within a distance of 150m. 2.8.1:earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all
Sector: RDPR