Details: appendix a 3.5.2:excavation in soil with dozer with lead upto 100 m excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. od80284/2024-2025:[od from dar 51.2.3]-filling with quarry muck.filling up low lying and water logged areas with local material /quarry muck ,spreading in layers ,levelling the top at site and consolidation by ramming,etc complete for improving the cbr value of subgrade od80286/2024-2025:providing plain cement concrete for road work cc 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification(i) nominal mix (1:2:4)
Sector: RDPR