Details: interlock 3.14:construction of subgrade and earthen shoulders<br> construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1. 3.15.2:compacting original ground<br> (ii) compacting original ground supporting subgrade<br> loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of tables 300.1 and 300.2 for subgrade construction as per technical specification clause 303.5.2. 4.1.a.1:granular sub-base with well graded material (table 400.1) <br> (a) by mix in place method <br> construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator a