Description: Chavakkad ULB Upgradation of MCF construction of toilet office area and dressing area in MCF Extension to existing MCF Work Name KSWMP Chavakkad ULB Upgradation of MCF RRF in the ULB Construction of toilet office area and dressing area in the MCF RRF at Chavakkad ULB General Civil Work Extension to the existing MCF
Details: CIVIL WORKS 2.32:Clearing grass and removal of the up to a distance of 50 m outside the periphery of the area cleared. 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:Edges of slabs and breaks in floors and wallsUnder 20 cm wide 5.9.5:Centering and shuttering including strutting, etc. and removal o
Sector: RDPR