Details: side protection 2.31:clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared 60.7.3:dismantling dr - dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in dr masonry including disposal of debris within a distance of 150m. od25506/2023-2024:bailing out water by engaging coolie - bailing out water by engaging coolie where ever necessary where pumping with engine and pump set not possible od37337/2024-2025:dr packing with departmental. stone - dry stone packing under foundation using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of departmental officers at site 2.6.1:earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in
Sector: Irrigation