Details: appendix-a-road work 2.3.2.a:clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness in area of light jungle - by mechanical means 3.6:excavation for roadwork in soil with hydraulic excavator of 0.9 bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m 55.4:supplying and stacking 36mm size hard broken stone in standard heaps for measurement. 55.8.a:filling up holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat o
Sector: PWD