Details: appendix-a-jjm- cwss to purakkad panchayath- construction of 15 ll ohsr in purakkad panchayath 2.31:clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared 15.7.4:demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge.in cement mortar 15.13.1:taking out doors, windows and clerestory window shutters (steel or wood ) including stacking within 50 metres lead:of area 3 sq. metes and below 15.28.2:dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :asbestos sheet od193458/2023-2024: conducting soil investigation work for ohsr site 2.8.1:earth work in excavation by mechanical means (hydraulic exca
Sector: Water supply and Sewerage