Details: road work od277103/2024-2025:scarifying the existing bituminous road surface to a depth of 50 mm and then levelling ground with scarified material mixed with water at omc and then by rolling so as to achieve minimum density by mechanical means <br> 4.1.b.1:construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at omc, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. grading-v - for sub-base drainage layer - mix in place method 3.18:construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required and compacted to meet requirement of table no. 300-2 4.12:providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at
Sector: PWD