Description: GENERAL Sabarimala Festival Works 2024 25 Upgradation with BM BC 3 22 km Improvements to Panippurapadi Ala Sreerangam Elavinchuvadu Temple Chammathumukku Kodukulanji road Leading Village Road General Civil Work Work Name GENERAL Sabarimala Festival Works 2024 25 Upgradation with BM BC 3 22 km Improvements to Panippurapadi Ala Sreerangam Elavinchuvadu Temple Chammathumukku Kodukulanji road Leading Village Road Sabarimala Festival Works 2024 25 Improvements to Panippurapadi Ala Sreerangam Elavinchuvadu Temple Chammathumukku Kodukulanji road Leading Village Road General Civil Work
Details: 1 Appendix A -Improvements to Roadway 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means 3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m OD148916/2024-2025:Scarifying the existing bituminous road surface to a depth of 50 mm then levelling the ground with scarified materials mixed with water at OMC and then by rolling so as to achieve minimum dens
Sector: PWD