Details: renovation of well od548454/2024-2025: bailing out water using 5hp pump- bailing out water with 5hp engine and pump set including conveyance to site and ,cost of fuel, lubrication oil and other stores, pay of staff etc complete 5.22.6:steel reinforcement for r.c.c work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelthermo - mechanically treated bars of grade fe-500d or more 5.31:extra for laying reinforced cement concrete in or under water and /or liquid mud including cost of pumping or bailling out water and removing slush etc., complete. note:- the quantity will be calculated by multiplying the depth measured from the subsoil water level upto the centre of gravity of the r.c.c. under subsoil water with the quantity of r.c.c. in cubic metre executed under subsoil water. the depth of centre of gravity shall be reconed correct to 0.1m. 0.05 m or more shall be taken as 0.1 and less than 0.05 m ignored. no extra payment shall be
Sector: RDPR