Details: foot path interlock 3.5.1:excavation in cutting in soil by manual means with lead upto 50 m <br> excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3 od502712/2024-2025:dry rubble masonry _ dry rubble without concrete levelling course masonry with good qualityblasted rubble including packing to compactness to lines and levels cost and conveyance of all materialslabour charges etc. complete as per direction of departmental officers at site (modified spec 60.7.1 of dar) od502719/2024-2025:filling with contractor own earth (excluding rock) in open areas in layers notexceeding 20 cm in depth, consolidating each deposited layer by ramming andwatering, lead up to 50 m and lift up to 1.5 m as per direction of site engineer-in-charge. od489965/2024-2025:granular sub-base/base/surface course with local materials (table 400.13) by mix in place method normal. const
Sector: RDPR