Details: road construction 3.5.2:excavation in soil with dozer with lead upto 100 m excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. od289505/2024-2025:dry rubble masonry -dry rubble without concrete levelling course masonry with good quality blastered rubble including packing to compactness to lines and levels cost and conveyance of all material labour charges etc.complete as per direction of departmental officers a site od510958/2024-2025: [od from mord 3.3 &3.4] - filling with contractors own earth (excluding rock) in open areas in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50m and lift upto 1.50m as per direction of site engineer - in charge od466150/2024-2025:filling available excavated earth (excluding rock) in trenche
Sector: RDPR