Details: protection wall od422225/2024-2025:dismantling dr - dismantling , clearing away and carefully stacking materials useful forreuse for any thickness of walls in dr masonry including disposal of debris within a distance of150m 2.6.1:earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.all kinds of soil od422224/2024-2025:dr with departmental. stone - dry rubble masonry _ dry rubble without concretelevelling course using departmental rubble including packing to compactness to lines and levels,labour charges etc. complete as per direction of departmental officers at site od422229/2024-2025:dry rubble masonry _ dry rubble without concrete levelling course masonry with goodquality blasted rubble including packing to compactness to lines and levels cost and conveya
Sector: RDPR