Details: road renovation 3.5.1:excavation in cutting in soil by manual means with lead upto 50 m <br> excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3 3.2:preparation of foundation for embankment <br> scarifying existing bituminous surface to a depth of 150 mm by mechanical means <br> scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4. od515007/2024-2025:granular sub base/base/surface course with local materials (table 400.13) by mix in place method nermal. construction of granular sub base by providing local materials spreading in uniform layers manually mixing by mix in place and compacting with rammers to achieve the desired density complete as per clause 401.4 as per technical specification clause 408 4.9:
Sector: RDPR