Details: road restoration works od403974/2024-2025:scarifying the existing bituminous road surface to a depth of 150 mm by mechanical meansscarifying the existing bituminous road surface to a depth of 150 mm and re-compacting theaggregate received from scarifying with static roller. od407740/2024-2025:construction of embankment with material obtained from borrow pits . construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead up to 1000 m as per technical specification clause 301.5.. 3.5.1:excavation in cutting in soil by manual means with lead upto 50 m <br> excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3 od407315/2024-2025:filling up low lying and water logged areas with local material/ q
Sector: RDPR