Details: yard concrete and diversion of drain 3.7:removal of unsuitable soil with disposal upto 1000 m <br> removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per clause 303.5.2 as per technical specification clause 302.3.11 11.4.1.1:providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 i. p.c.c grade m 10 (i) nominal mix 1:3:6 11.4.4:providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 iv. r.c.c grade m 20 11.8:supplying, fitting and placingtmt bar reinforcement in foundation complete as per drawings and technical specifications clauses 1000 and 1202 pvc water tank 18.48:providing and placing on terrace (at all floor levels) polyeth
Sector: Harbor