Details: ghss koduvayoor in nenmara- total station survey 56.12.a : total station surveying and preparation of site plan for plain and open area without hindrance to line of sight with 1 m contour intervals , with 5m x 5m interval. 56.12.b : total station surveying and preparation of site plan for plain built up area with hindrance to line of sight due to buildings/structures. 56.13 : providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (this item is applicable only for sites without access such as in case of new road formation, bridge and building sites at in accessible locations) rural play ground at ayiloor grama panchayath in nenmara -total station survey 56.12.a : total station surveying and preparation of site plan for plain and open area without hindrance to line of sight with 1 m contour intervals , with 5m x 5m interval. 56.12.b : total s
Sector: Sports