Details: road maintenance od503227/2024-2025:surface dressing of the ground including removing's vegetations and in-equalities not exceeding 15cm deep and disposal of , lead up to 50m and lift up to 1.50m. od503225/2024-2025:filling with contractors own earth (excluding rock ) in trenches ,plinth,sides of foundations etc in layers not exceeding 20 cm in depth ,consolidating each deposited layer by ramming and watering , lead up to 50 m and lift up to 1.5 m as per direction of site engineer - in -charge 3.2:preparation of foundation for embankment <br> scarifying existing bituminous surface to a depth of 150 mm by mechanical means <br> scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4. 4.9:wet mix macadam <br> providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixin
Sector: RDPR