Details: repair works of lifeboat and davit in mv bharat seema. lifeboat satatic and davit load test due (15.12.2025) - to be undertaken lifeboat dynamic wnich braek test of devit due (18.11.2025)/ (15.01.2026) lifeboat number 1, 2, 3, 4 & 5 winches foundation plate to be renewed all lifeboat winches foundation bolts and nuts to be renewed lifeboat 1,2,3 & 4 brake drum found damaged. same to be renewd. lifeboat davit limit switches to be renewed all davit track way to be repaired - in thinned downed areas brake pads to be renewed in all winches
Sector: Harbor