Details: chenkara division road number 8 concreting od532188/2024-2025:surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of , lead up to 50 m and lift up to 1.5 m. all kinds of soil.(modified from 2.28.1) 75.8.1:providing plain cement concrete for road work cc 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification(i) nominal mix (1:2:4) od532187/2024-2025:providing and fixing of good granite name board with lettering including of all cost conveyance labour charge etc. complete
Sector: RDPR