Details: road renovation 3.2:preparation of foundation for embankment <br> scarifying existing bituminous surface to a depth of 150 mm by mechanical means <br> scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4. 2.14.2.a:dismantling of flexible pavements<br> dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per technical specification clause 202 <br> (ii) by mechanical means<br> (a) bituminous courses 4.11.2:granular sub-base/base/surface course with local materials (table 400.13) by mix in place method normal. construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel ro
Sector: RDPR