Details: renovation of drainage od367464/2024-2025: earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m. all kinds of soil od369737/2024-2025:dismantling dr-dismantling,cleaning away and carefully stacking materials useful for reuse for any thickness of walls in dr masonry including disposal of debris wwithin a distance of 150m. 11.1.1.1:excavation for structures earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. i. ordinary soil (i) upto 3 m depth od369727/2024-2025:dr with departmental. stone -dry rubble masonry _ dry rubble without c
Sector: RDPR