Details: investigation 56.17.1:providing access to the site,clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing. 56.1.a:mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - for machine boring 56.2.a:setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - for machine boring. 56.3.a.1:boring with rotary power drilling equipment's in - all types of soil having n value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary s.p.t and recovery of undisturbed soil samples at 5m intervals - for ordinary soil. 56.5.a:boring through all class
Sector: PWD