Details: work name annual plan edavanna gp kelan thod renovation pro 469 24 25 general civil work side protection 2.8.1:earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and
Sector: RDPR