Details: appendix-a reactive maintenance (initial rectification work) 55.4:supplying and stacking 36mm size hard broken stone in standard heaps for measurement. 55.2:supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(irc 3.2.1.a) 55.8.a:filling up holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. 55.9.a:filling up holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface. 4.12:providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform
Sector: PWD