Details: side protection od247668/2024-2025:ring bund type ii putting up ring bund with earth filled gunny bags of top width 1.0m bottomwidth 2.0m height 2.0m side and filling in between with earth to form ring bund andmaintaining the same leak proof till the completion of the work and clearing the site bydismantling the bund after completion of the work etc complete, od249164/2024-2025:pumping or bailing out water and removing slush etc by using pump set including cost oflabour, oil hire charges of pumpset, etc complete 3.5.1:excavation in cutting in soil by manual means with lead upto 50 m excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3 od247667/2024-2025:coconut pile - supplying and stacking well matured straight coconut post fordriving down throug various strata bellow bed level including cost coveyancelabour charges etc complete od247666/2024-2025:coconut pi
Sector: RDPR