Details: protection work 60.2.2:bailing out water using 5hp pump- bailing out water with 5hp engine and pump set including conveyance to site and ,cost of fuel, lubrication oil and other stores, pay of staff etc complete 2.6.1:earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.all kinds of soil 60.7.2:dr packing under foundation - dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. 4.1.6:providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) 4.1.5:providing and layi
Sector: Irrigation