Details: renovation of bathing ghat 60.1.2:ring bund type ii putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. 60.2.2:bailing out water using 5hp pump- bailing out water with 5hp engine and pump set including conveyance to site and ,cost of fuel, lubrication oil and other stores, pay of staff etc complete 2.6.1:earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.all kinds of soil 60.7.1:dry rubble masonry _ dry rubble without concrete levelling course masonry with good quality blasted rubble including packi
Sector: Irrigation